3.1 · What Is Validated3.1 · 已验证的部分 3.2 · What Is Not3.2 · 尚未完成的部分

What Is Already True, and What Is Not

哪些已经是事实,哪些还不是

These pages have one job: to stop anyone mistaking a validated pilot for a running business. The left column is measured. The right column is empty, and it will stay listed as empty until it is not.

这几页只有一个任务:不让任何人把一个已验证的中试误认为一门正在运转的生意。左边一栏是实测数据,右边一栏是空的——并且在它不再为空之前,它会一直以空的状态被列着。

3.1

What Has Been Validated已验证的部分

Metric指标 Current pilot value当前中试值 Conventional benchmark常规对照 Basis数据性质
Cycle to transplant grade育苗至移栽标准周期 4 months4 个月 12–18 months12–18 个月 Pilot measured中试实测
Batches per year年产批次 31 Pilot measured中试实测
Survival rate成活率 92–96% 70–85%70–85% Pilot batch statistics中试批次统计
Batch consistency (CV of biomass)批次一致性(生物量变异系数) <8% Not controlled不可控 Pilot batch statistics中试批次统计
Cost per seedling单株成本 ¥6.61 ¥18–25 purchased-in外购苗 ¥18–25 Pilot cost accounting中试成本核算
Market price per seedling单株市场售价 ¥25 Nursery list price苗圃挂牌价 Market reference市场参考价
Unit gross margin单位毛利率 73.5% Nursery: ~35–45%苗圃:约35–45% Derived推算
Water consumption用水量 >90% saving节水 >90% 100% baseline100% 基准 Flow-meter accounting流量计核算
Pesticide application农药使用 0 Routine schedule常规施药 Operational fact运营事实
Flavour precursor content风味前体物质 Indicative — needs third-party assay指示性——待第三方检测 — Internal screening内部筛查

Pilot values come from the current validation bay, not from a commercial-scale module. Third-party verification of the cost, survival and flavour-precursor lines is one of the explicit line items in this round's use of funds.中试值来自当前验证舱,而非商业级模块。成本、成活率与风味前体三项的第三方验证,是本轮资金用途中的明确科目。

3.2

What Has Not Been Done尚未完成的部分

Not done — and we will not imply otherwise未完成——我们不会暗示相反

  • No mass production. The commercial module exists as an engineered design, not as steel on the ground.未量产。商业级模块目前是工程图纸,不是已落地运转的设备。
  • No scaled revenue. Revenue to date is negligible; there is no commercial shipment record.无规模化收入。累计收入可忽略,无商业出货记录。
  • No audited financial statements.无审计财务报表。
  • No purchase orders or letters of intent from plantation customers.未取得种植园客户的采购订单或意向书。
  • Patent is not yet granted — preliminary examination only.专利尚未授权——仅完成初步审查。
  • No third-party cupping panel has scored the output.尚未由第三方杯测机构对产出评分。
  • No ESG, water-footprint or carbon baseline certified by an accredited body.尚无权威机构认证的 ESG、水足迹或碳基线。

What we do have我们已经有的

  • A filed invention patent on the full-cycle method and system, preliminary examination passed 2026-09-09.一项已提交的发明专利,覆盖全周期方法与系统,2026-09-09 初审合格。
  • A working pilot process that repeatedly produces transplant-grade seedlings in 4 months.一套可运转的中试工艺,可重复地在 4 个月内产出达移栽标准的幼苗。
  • A multi-batch parameter library — the compounding asset described in the technology section.一份多批次参数库——即技术章节所述的复利型资产。
  • A complete cost model with line-itemed capex and opex per standard module.一套完整成本模型,含单标准模块的资本开支与运营成本明细。
  • Two co-founders with a documented operating record — the prototype and the patent filing are both their own work; one leads hardware and systems, one leads operations and commercial scale-up, with three senior seats scoped and budgeted under this round. See Founding Team.两位有完整操作记录的联合创始人——原型机与专利申报均出自二人之手;一位负责硬件与系统,一位负责营运与商业规模化。本轮已界定并预算三个高级岗位。详见创始团队。
  • A climate-driven demand thesis corroborated by ICO research, not by our own extrapolation.一条气候驱动的需求逻辑,由 ICO 研究支撑,而非我方外推。
Validated & Not已验证与未完成18-Month Ladder18个月里程碑
← Previous← 上一页
Technical Risk技术风险
Next →下一页 →
18-Month Ladder18个月里程碑